Translate

Friday, July 6, 2012

Maintenance skills and announcements to extend Long life of the Concrete Mixer Truck


To extend concrete mixer truck (http://www.ecvv.com/product_directory/Concrete-Mixer-Truck.html) using life, much maintenance method and clean are inevitable whenever it is using or not in using.

1. Concrete mixer should be set in the flat position, paving the front and rear axle with square wood, so that the tire resting on a high overhead, so as to avoid moving around when starting.

2, concrete truck should implement the 2 level leakage current protections. After the power is turned on, you must carefully check the empty test switch that confirms qualification before use. Commissioning should be tested under normal circumstances if drum speed is appropriate. The proportion of empty speed vehicles (after charging) is slightly faster 2 to 3 turn, if the difference of the speed is too much, that means you should adjusted to move the ratio of the wheel and drive wheel.

3, the direction of rotation of the mixing drum should be consistent with the direction of the arrow. If they are not inconsistent with the each other, you should correct the motor wiring.

4, Check the clutch and brake device’s reliability. Idling in the mixing cylinder, add water 1 - 2min, check the transmission clutches and brakes are flexible and reliable before work. If the wire rope damage or not, and whether track pulley is good. Check the lubrication at the fuel circuit and control equipment, as required, filling oil around the barrier-free and the parts of the lubrication.

5, after the booting, always pay attention to all parts of the concrete truck is functioning properly. When the machine shut down, often check whether the concrete mixer blades bent, or nail loose screws. In the running process of concrete mixer, seizes any time to check and listen to the noise of the motor, speed reducer, transmission gear. At the same time to test if temperature is too high.
6, after the end of the work shifts should carefully clean the concrete truck (www.ecvv.com/product_directory/Concreter-Truck.html). Maintenance of the body cleans and removes dirt and obstructions in the body. when the concrete mixing is completed or is expected to stop for more than 1h, except to net, the application of stones and water poured into the shaking barrel, start to turn the stick in the barrel of the mortar rinse all discharged. No water in the barrel, in order to avoid the barrel and leaf rust. Works should also clean up the mixing drum fouling, mechanical to kept clean and intact.
7, after work and when shut down not in use, you should turn off its power, and lock the switch box, to ensure safety.

No comments: